![img](https://rsc-bd.org/themes/rsc/assets/images/workers_banner.jpg)
Photo Gallery
RSC safety inspection
![](https://rsc-bd.org/storage/app/uploads/public/610/91d/928/61091d9281e9e613504333.jpg)
Column Size Mesurement
![](https://rsc-bd.org/storage/app/uploads/public/610/91d/933/61091d93317b9689126003.jpg)
Ferro Scanning in Column
![](https://rsc-bd.org/storage/app/uploads/public/610/91d/933/61091d9339da5501187348.jpg)
As-Built Drawing Checking (rooftop)
![](https://rsc-bd.org/storage/app/uploads/public/610/91d/93c/61091d93cb86b194099711.jpg)
Ferro Scanning
![](https://rsc-bd.org/storage/app/uploads/public/610/91d/947/61091d9475e5e956177121.jpg)
Fire safety inspection
![](https://rsc-bd.org/storage/app/uploads/public/610/91d/94c/61091d94c4814728640048.jpg)
Floor Visit
![](https://rsc-bd.org/storage/app/uploads/public/610/91d/953/61091d9530870109962390.jpg)
Fire safety inspection
![](https://rsc-bd.org/storage/app/uploads/public/610/91d/955/61091d955e228100017520.jpg)
Floor Visit_As Built Drawing Check
![](https://rsc-bd.org/storage/app/uploads/public/610/91d/958/61091d958a617647584815.jpg)
IMG_20210106_112954
![](https://rsc-bd.org/storage/app/uploads/public/610/91d/95a/61091d95ac20b194022188.jpg)
IMG_20210106_160010
![](https://rsc-bd.org/storage/app/uploads/public/610/91d/960/61091d960c219527158998.jpg)
Testing Commissioning Verification
![](https://rsc-bd.org/storage/app/uploads/public/610/91d/962/61091d962f01f244097483.jpg)
Rebar Checking
![](https://rsc-bd.org/storage/app/uploads/public/610/91d/966/61091d9666b43856443122.jpg)
Testing Commissioning Verification
Boiler safety remediation
![](https://rsc-bd.org/storage/app/uploads/public/610/a28/0a0/610a280a0ab70046409503.jpg)
RSC boiler visual inspection - Checking burner nameplate data
![](https://rsc-bd.org/storage/app/uploads/public/610/a28/0a0/610a280a0e4b3355266414.jpg)
RSC boiler visual inspection - Checking boiler nameplate data
![](https://rsc-bd.org/storage/app/uploads/public/610/a28/0a7/610a280a765dd155203871.jpg)
RSC boiler visual inspection - Soid fuel boiler combustion chamber
![](https://rsc-bd.org/storage/app/uploads/public/610/a28/0b6/610a280b651f2660020167.jpg)
RSC Visual Inspection of Boiler - Non BBR Boiler
Fire safety remediation
![](https://rsc-bd.org/storage/app/uploads/public/610/934/bb2/610934bb21424616310302.jpg)
Fire door and Handrails on stair
![](https://rsc-bd.org/storage/app/uploads/public/610/934/bbc/610934bbc0dd0586741795.jpg)
Fire door opening to exit corridor
![](https://rsc-bd.org/storage/app/uploads/public/610/934/bc1/610934bc18a42700566358.jpg)
Fire hose
![](https://rsc-bd.org/storage/app/uploads/public/610/934/bc6/610934bc69d72185116814.jpg)
Fire Pumps
![](https://rsc-bd.org/storage/app/uploads/public/610/934/bca/610934bcaf547045618462.jpg)
Fire door
![](https://rsc-bd.org/storage/app/uploads/public/610/934/bcb/610934bcbef9e169850294.jpg)
Hydrant system
![](https://rsc-bd.org/storage/app/uploads/public/610/934/bd5/610934bd502b7354148344.jpg)
Installation of sprinkler system
Safety Committee and Safety Training Programme
![](https://rsc-bd.org/storage/app/uploads/public/610/935/532/610935532b734174550598.jpg)
RSC Safety Committee Training 2
![](https://rsc-bd.org/storage/app/uploads/public/610/935/538/610935538031f590655263.jpg)
RSC Safety Committee Training 1
![](https://rsc-bd.org/storage/app/uploads/public/610/935/53c/61093553c10d9559824630.jpg)
RSC Safety Committee Training 3
![](https://rsc-bd.org/storage/app/uploads/public/610/935/53c/61093553c5599656250185.jpg)
RSC Safety Committee Training 4
![](https://rsc-bd.org/storage/app/uploads/public/610/935/541/6109355412c47514232053.jpeg)
RSC Safety Committee Training 5
![](https://rsc-bd.org/storage/app/uploads/public/610/935/545/61093554589ce011169197.jpeg)
RSC Safety Committee Training 7
![](https://rsc-bd.org/storage/app/uploads/public/610/935/549/61093554978c2643659681.jpg)
RSC Safety Committee Training 8
![](https://rsc-bd.org/storage/app/uploads/public/610/935/54b/61093554b8942766096949.jpg)
RSC Safety Committee Training 6
Structural safety remediation
![](https://rsc-bd.org/storage/app/uploads/public/610/935/e73/610935e7362b1414910062.jpg)
Construction of vertical bracing to improve lateral stability
![](https://rsc-bd.org/storage/app/uploads/public/610/935/e7c/610935e7c4825252837823.jpg)
New shear wall provided to improve lateral stability
![](https://rsc-bd.org/storage/app/uploads/public/610/935/e7d/610935e7dd4c0217364034.jpg)
Plate Load Test
![](https://rsc-bd.org/storage/app/uploads/public/610/935/e82/610935e82b3b0055953440.jpg)
Retrofitting Column Size Checking
![](https://rsc-bd.org/storage/app/uploads/public/610/935/e83/610935e830cb3941131618.jpg)
RC Jacketing
![](https://rsc-bd.org/storage/app/uploads/public/610/935/e86/610935e86f4a4001440070.jpg)
Roof Bracing Retrofitting
Before-after completion of safety remediation
![](https://rsc-bd.org/storage/app/uploads/public/610/936/d44/610936d444b73288185729.jpg)
Exposed corroded rebar_Before
![](https://rsc-bd.org/storage/app/uploads/public/610/936/d48/610936d48bcfb252793757.jpg)
Fire separation
![](https://rsc-bd.org/storage/app/uploads/public/610/936/d49/610936d491b52627018710.jpg)
Exposed rebar covered by CC casting_After
![](https://rsc-bd.org/storage/app/uploads/public/610/936/d4d/610936d4d7a35027083943.jpg)
Means of egress 2 (left-collapsible gate_ right -adequate fire door).
![](https://rsc-bd.org/storage/app/uploads/public/610/936/d52/610936d523c23761369014.jpg)
No water proofing membrane on rooftop_Before
![](https://rsc-bd.org/storage/app/uploads/public/610/936/d52/610936d52d3b0506143387.jpg)
Means of egress 1 (left-storage blocking emergency aisles on stairs.
![](https://rsc-bd.org/storage/app/uploads/public/610/936/d5a/610936d5ada2b025421829.jpg)
Water proofing membrane on rooftop_After
Remediation completed with support from Accord Remediation Fund
Occupational Safety and Health Complaints Mechanism
Electrical safety remediation items
![img](https://rsc-bd.org/themes/rsc/assets/images/bottom-bg.png)