Photo Gallery
RSC safety inspection

Column Size Mesurement

Ferro Scanning in Column

As-Built Drawing Checking (rooftop)

Ferro Scanning

Fire safety inspection

Floor Visit

Fire safety inspection

Floor Visit_As Built Drawing Check

IMG_20210106_112954

IMG_20210106_160010

Testing Commissioning Verification

Rebar Checking

Testing Commissioning Verification
Boiler safety remediation

RSC boiler visual inspection - Checking burner nameplate data

RSC boiler visual inspection - Checking boiler nameplate data

RSC boiler visual inspection - Soid fuel boiler combustion chamber

RSC Visual Inspection of Boiler - Non BBR Boiler
Fire safety remediation

Fire door and Handrails on stair

Fire door opening to exit corridor

Fire hose

Fire Pumps

Fire door

Hydrant system

Installation of sprinkler system
Safety Committee and Safety Training Programme

RSC Safety Committee Training 2

RSC Safety Committee Training 1

RSC Safety Committee Training 3

RSC Safety Committee Training 4

RSC Safety Committee Training 5

RSC Safety Committee Training 7

RSC Safety Committee Training 8

RSC Safety Committee Training 6
Structural safety remediation

Construction of vertical bracing to improve lateral stability

New shear wall provided to improve lateral stability

Plate Load Test

Retrofitting Column Size Checking

RC Jacketing

Roof Bracing Retrofitting
Before-after completion of safety remediation

Exposed corroded rebar_Before

Fire separation

Exposed rebar covered by CC casting_After

Means of egress 2 (left-collapsible gate_ right -adequate fire door).

No water proofing membrane on rooftop_Before

Means of egress 1 (left-storage blocking emergency aisles on stairs.

Water proofing membrane on rooftop_After
Remediation completed with support from Accord Remediation Fund
Occupational Safety and Health Complaints Mechanism
Electrical safety remediation items