RSC safety inspection
Column Size Mesurement
Ferro Scanning in Column
As-Built Drawing Checking (rooftop)
Ferro Scanning
Fire safety inspection
Floor Visit
Fire safety inspection
Floor Visit_As Built Drawing Check
IMG_20210106_112954
IMG_20210106_160010
Testing Commissioning Verification
Rebar Checking
Testing Commissioning Verification
Boiler safety remediation
RSC boiler visual inspection - Checking burner nameplate data
RSC boiler visual inspection - Checking boiler nameplate data
RSC boiler visual inspection - Soid fuel boiler combustion chamber
RSC Visual Inspection of Boiler - Non BBR Boiler
Fire safety remediation
Fire door and Handrails on stair
Fire door opening to exit corridor
Fire hose
Fire Pumps
Fire door
Hydrant system
Installation of sprinkler system
Safety Committee and Safety Training Programme
RSC Safety Committee Training 2
RSC Safety Committee Training 1
RSC Safety Committee Training 3
RSC Safety Committee Training 4
RSC Safety Committee Training 5
RSC Safety Committee Training 7
RSC Safety Committee Training 8
RSC Safety Committee Training 6
Structural safety remediation
Construction of vertical bracing to improve lateral stability
New shear wall provided to improve lateral stability
Plate Load Test
Retrofitting Column Size Checking
RC Jacketing
Roof Bracing Retrofitting
Before-after completion of safety remediation
Exposed corroded rebar_Before
Fire separation
Exposed rebar covered by CC casting_After
Means of egress 2 (left-collapsible gate_ right -adequate fire door).
No water proofing membrane on rooftop_Before
Means of egress 1 (left-storage blocking emergency aisles on stairs.
Water proofing membrane on rooftop_After
Remediation completed with support from Accord Remediation Fund
Occupational Safety and Health Complaints Mechanism
Electrical safety remediation items